| The outer leaf is left one block down from the DPC and the cavity filled with a weak concrete mix to that level. Bitumonous paint will be applied before the blockwork is taken above DPC - this is further described at Block work to joist level |
|
|
The photo to the left shows the preparation below slab to support chimney breast. |