|
|
The architects plans will give the dimensions required. In this case we have increased the dimension, the pit being at least 2 cubic metres. |
Ensure that the pipes going into the pit are sufficiently low so as not to be disturbed or impacted by whatever is to be above the pit. |
|
|
The soakpit is filled with clean stone. |
The pit is covered with a geotextile material, which will stop fine particles from being washed into the pit. |